Skip to content
Monday – Friday: 7 a.m. – 5 p.m.Replies by the next business dayHome Improvement Contractor · NJ HIC reg. # 000000VerifyLead-Safe Certified Firm (Renovation, Repair and Painting) · US Cert. # 000000VerifyGeneral liability and workers' compensation · Certificate of insurance sent on request
2 more licenses
  • Home Improvement Contractor · NJ HIC reg. # 000000Verify
  • Lead-Safe Certified Firm (Renovation, Repair and Painting) · US Cert. # 000000Verify
  • General liability and workers' compensation · Certificate of insurance sent on request
(973) 555-0102

Floors

Floors that last the next lease

We repair what can be repaired, replace what can't, and say which on the work order.

What we do

  • Lifting or damaged vinyl plank re-seated or replaced

  • Cracked tile and loose grout repaired

  • Transition strips and thresholds reset

  • Old carpet pulled and hauled

  • Subfloor checked wherever a board has lifted

  • Hardwood screen-and-recoat quoted separately

A worker in a hard hat setting floor tile in mortar during an interior renovation

What changes the price

Three things that move the number

  • Repair or replace

    A few bad planks are a repair. A floor that has moved or cupped is a replacement, and we show you why with photos.

  • Room size and layout

    Price follows the square footage and the cuts. A kitchen with an island costs more per foot than a bedroom.

  • The subfloor

    Sound subfloor is invisible and costs nothing. A soft or wet one is a change order, priced before we go on.

Rules

Permits, moisture and old tile

Floor work in a rental usually needs no permit. If we find a wet or rotted subfloor, we stop, photograph it and write a change order before going on.

Old vinyl tile and its adhesive in older buildings can contain asbestos. We don't sand or break it up. We stop and tell you who tests and removes it.

Examples

Sample work, with the scope in each caption

Floor tile set in thinset with tile spacers
Kitchen tile reset in thinset, spacers in
Hands marking a wood-look floor panel with a pencil beside a mallet
Vinyl plank marked for a cut at the doorway
A man kneeling on a subfloor marking boards for installation
Subfloor checked before new planks go down

Sample photos.

Questions about this job

Do you refinish hardwood?

A light screen-and-recoat is an add-on we quote after seeing the floor. Full sanding and staining is a different crew, and we'll say so.

Which flooring do you install?

Vinyl plank and tile for rentals. You pick the grade and color once, and it goes on your house sheet.

How long does a floor add?

A repair adds hours. A full room of plank adds a day. The work order says which, and moves the return date if needed.

Send us the unit

Unit type, the date the keys are free and a few photos are enough for a written work order.