Skip to content
Monday – Friday: 7 a.m. – 5 p.m.Replies by the next business dayHome Improvement Contractor · NJ HIC reg. # 000000VerifyLead-Safe Certified Firm (Renovation, Repair and Painting) · US Cert. # 000000VerifyGeneral liability and workers' compensation · Certificate of insurance sent on request
2 more licenses
  • Home Improvement Contractor · NJ HIC reg. # 000000Verify
  • Lead-Safe Certified Firm (Renovation, Repair and Painting) · US Cert. # 000000Verify
  • General liability and workers' compensation · Certificate of insurance sent on request
(973) 555-0102

Unit turns for landlords · Newark, NJ

Keys in Monday. Ready to show Friday.

We turn studios through three-bedrooms between tenants: paint, patch, floors, fixtures and a deep clean, priced by unit type on a one-page turn sheet, with a photo report when the keys come back.

  • 5 working days

    A standard studio to two-bedroom turn
  • 1 page

    Turn sheet, priced by unit type
  • Every unit

    Photo report with the keys

The five days run from key handoff to photo report on a standard unit. The work order names the date.

An empty room with hardwood floors and natural light, ready for the next tenant

The turn

Five days, key to key

For a standard studio to two-bedroom with no water damage or structural repair. Bigger units and extra scope take longer, and the work order says how long before we start.

  1. Day 1

    Step 1: Monday: walk and work order

    We walk the empty unit with you or your super, photograph every room and write the work order that day: what we'll do, what it costs and the date the keys come back.

    A blank clipboard pinned to a cork board
    Work order written on site
  2. Day 2

    Step 2: Tuesday: patch and repair

    Nail holes, drywall dings, trim gaps, sticking doors and tub caulk. Everything is primed before paint so the color goes on once.

    A worker smoothing a patched wall with a long straightedge
    Walls patched and primed
  3. Day 3

    Step 3: Wednesday: paint

    Ceilings, walls and trim in your house color, two coats. Floors, fixtures and windows are covered, and the crew wears respirators.

    A painter in coveralls and a mask rolling a ceiling
    Ceilings first, then walls
  4. Day 4

    Step 4: Thursday: floors, hardware, alarms

    Floor repairs, locks re-keyed, door hardware tightened or swapped, smoke and CO alarms tested, filters and bulbs replaced.

    A brass door knob on a painted panel door
    Locks and hardware
  5. Day 5

    Step 5: Friday: clean, final walk, keys

    Deep clean and trash-out, a final walk against the work order, then the photo report and the keys.

    A set of keys hanging in a door lock
    Keys back with the report

The turn sheet

What a standard turn includes, by unit type

Each column is a unit type and each row a line on the work order. Your written work order sets the price for your unit.

What a standard turn includes, by unit type
Studiostandard turnUp to 450 sq ft
1 bedroomstandard turnUp to 650 sq ft
2 bedroomsstandard turnUp to 900 sq ft
3 bedroomsstandard turnUp to 1,200 sq ft
Paint: walls, ceilings and trim, two coats
Patch, prime and caulk
Deep clean and one truckload of trash-out
Locks re-keyed, alarms tested, filters and bulbs
Photo report with the keys

For an unfurnished unit in normal condition. Not included: appliances, new flooring, tub re-glazing, permits and anything found behind a wall; those are priced on the work order before we start.

The photo report

What comes back with the keys

A numbered report, room by room, with photos taken at the final walk. This sample is one kitchen.

A rental kitchen with granite counters and stainless appliances
  1. 1

    Cabinets and counters

    Doors and drawers wiped inside and out, hinges tightened, counter edge caulk renewed.

  2. 2

    Range and hood

    Degreased. Burners and oven tested, and any that don't work are noted with a photo.

  3. 3

    Floor

    Swept and mopped. A lifting or cracked plank gets a close-up and a line on the report.

  4. 4

    Doors and hardware

    Knobs tight, latches catch, stops in place. Locks re-keyed and the new keys counted.

Sample content.

Every report lists what was done, what was found and what needs your decision.

Scope

A turn, an add-on, a rehab

We say where a turn stops, so the work order never surprises you.

A turn, an add-on, a rehab
Turn plus add-onsRehabStandard turn
What it coversTurn plus add-onsFloors, tub re-glazing, cabinet refresh, fixtures, new doorsRehabKitchens, baths, layout changes, building systemsStandard turnPaint, patch, clean, hardware, locks and alarms
How longTurn plus add-onsDays added, written on the work orderRehabWeeks or monthsStandard turnFive working days
How it's pricedTurn plus add-onsTurn sheet plus priced add-onsRehabNot our work; we refer you to a general contractorStandard turnFrom the turn sheet, by unit type
PermitsTurn plus add-onsWe tell you if one appliesRehabYes, pulled by the licensed tradeStandard turnUsually none for cosmetic work; your town decides

Vendor file

What your accountant and insurer ask for

One folder per landlord, kept current and sent when you ask. The registration number is in the footer of every page.

  • Registration

    • Home Improvement ContractorVerify

      NJ HIC reg. # 000000 · New Jersey Division of Consumer Affairs

      Registration the state requires to do home improvement work in New Jersey

  • Lead-safe certificate

    • Lead-Safe Certified Firm (Renovation, Repair and Painting)Verify

      US Cert. # 000000 · U.S. Environmental Protection Agency

      Certified to follow the EPA's lead-safe work rules in housing built before 1978

  • Insurance

    • General liability and workers' compensation

      Certificate of insurance sent on request

      Coverage for the crew and the building while we work

  • Documents on request

    • W-9

      Sent by email the same day you ask

    • Certificate of insurance

      Names your company as certificate holder

    • House sheet

      Your paint colors, hardware and keys, kept for every unit

Landlords

What landlords and managers say

“The report came with a photo of every room and a list of what was swapped, so I stopped driving over on day three. The next tenant moved in on schedule.”

Elbert T.Owner of a six-unit building, Roselle

“I keep my paint color and my lock brand on the house sheet. Every unit comes back the same, and I don't have to explain it again.”

Jacklyn R.Landlord of two three-families, Hillside

“When they opened the bathroom wall and found a leak, I had photos and a priced change order before lunch. I approved it from my phone.”

Krzysztof D.Property manager, Cranford

Sample reviews.

Service area

Units across Essex and Union counties

Our yard is on Ferry Street in the Ironbound. Most turns are within a short drive of it, so a crew can be at a unit the morning after the keys change hands.

Essex County

  • Newark
  • South Orange
  • Glen Ridge
  • Millburn

Union County

  • Hillside
  • Roselle
  • Roselle Park
  • Kenilworth
  • Cranford
  • Garwood
  • Clark
  • Mountainside
  • Summit
  • Fanwood
  • Scotch Plains

We don't work in Hudson or Passaic counties or at the shore. For a gut rehab, a roof or an addition we'll point you to a general contractor.

Questions landlords ask first

What counts as a standard turn?

A unit up to about 900 square feet in normal condition: patch, paint, hardware, alarms and a deep clean, with no water damage or structural repair. The turn sheet lists each line and its price.

What if the unit needs more than a turn?

Floors, a re-glazed tub, cabinet doors and new hardware are add-ons, priced on the work order with the days they add. A full rehab isn't our work, and we'll refer you to a general contractor.

What if you find damage behind a wall?

We stop, photograph it and send you a change order with its price before we go on. Nothing is billed that you haven't seen.

Do you work while a tenant is still in the unit?

No. We work in empty units. A walk-through with the tenant present is fine, and the five days start when the keys are yours to hand us.

My building was built before 1978. Does that change anything?

Yes. The EPA's rule on lead paint covers paid repair and paint work in housing built before 1978, rentals included, and we follow it on every unit it covers. Repairs under 6 square feet inside or 20 outside are exempt, but window replacement and demolition never are. New Jersey also has its own lead-inspection rules for older rentals; confirm yours with your inspector.

How do I pay?

Deposit terms are written on the work order as New Jersey rules require. Landlords with several units can be invoiced per unit, with the terms on the work order.

Work order request

Tell us about the unit

Unit type, the date the keys are free and a few photos are enough for a written work order.

Hours
Monday – FridayToday
7 a.m. – 5 p.m.
SaturdayToday
8 a.m. – 12 p.m. (key drop-off)
SundayToday
Closed
Unit type

We reply by the next business day with a work order: scope, price and the date the keys come back. Sending this doesn't commit you to anything.